X
Big news! Derutu 2024 new DM intelligent plastering machines DM Leading and DM Leading PRO are on the market
2024-09-17 12:59:42
The 2024 DM series plastering machine has five major upgrades and improvements:
1. Chassis: The 2024 model has lowered the overall height of the chassis, and the adjusted assembly method and process have made the overall more compact and lower the center of gravity, thereby greatly improving stability.
2. Upgrade of track material and production process: The 2024 model uses 6005T standard aluminum-magnesium alloy profiles, and the structure adopts a double-layer hollow and special-shaped structure, which reduces the weight and enhances the bending resistance.
3. Scraper: In actual plastering construction, the plastering materials cannot be standardized and unified. The expansion force, compressive strength, thinness, hardness and softness of the materials are constantly changing. The old scraper cannot meet the complex materials, the verticality cannot be maintained all the time, and the uniformity and verticality of the working surface cannot be guaranteed. The new 2024 model adopts a three-blade solution, which consists of a leveling knife on the top and two finishing knives, which greatly improves verticality, smoothness and flatness. And it can be extended to develop a variety of spatulas.
4. Fixed structure: The 2024 model adjusts the fixed support structure from the center of the track to the bottom of the track, and adjusts the connection point from the original bottom to the upper half of the track, and expands the distance between the two points as much as possible under possible conditions, so as to achieve the most stable state.
5. Lifting motor: In the actual construction site, different working conditions, different proficiency levels, and different requirements for the lifting speed of the equipment require different speeds to cope with different situations. The 2024 model uses an adjustable speed motor and inverter to achieve convenient adjustment of the plastering speed, meeting the requirements of different plastering materials, different working conditions, and different operators.